Last update 28 August 2023
Mileages are given in the form miles.chains unless stated otherwise. Figures prefixed with ≈ are approximate, those in parentheses are not on this route but are given for reference. Reference to 'start'/'end' of an asset are as read down the page.
0.00 junction with LEC1 (46.38) 0.36 junction with south facing link to LEC1 0.62 Flyover Junction with BFO (0.00) 0.76 Swanbourne sidings 1.27 temporary end of line 1.31 2023 reconstruction worksite boundary (East West Rail) 5.15 SWANBOURNE 7.10 WINSLOW [1] 7.36 WINSLOW [2] 9.29 VERNEY JUNCTION 9.37 Verney Junction with MCJ2 (50.56) and BVJ (0.08) 11.16 CLAYDON 11.26 2023 reconstruction worksite boundary (East West Rail/HS2) 12.57 Claydon L&NE Junction with MCJ4 (0.41) 13.35 2023 reconstruction worksite boundary (HS2/East West Rail) 15.05 MARSH GIBBON & POUNDON 17.14 LAUNTON 18.44 Bicester gas works 18.79 junction with WEJ (8.76) 19.00 Gavray Junction with BSG (0.52) 19.34 BICESTER TOWN formerly B.; B. LONDON ROAD 19.40 BICESTER VILLAGE 19.51 Bicester goods yard 20.00 connection to Central Ordnance depot 20.52 WENDLEBURY 22.65 CHARLTON 24.07 ODDINGTON 25.27 ISLIP [1] 25.35 ISLIP [2] 27.51 OXFORD PARKWAY 27.58 OXFORD ROAD 27.59 Oxford Road Junction with WOL (0.00) 28.29 junction with Woodstock Curve (0.37?) 28.46 Woodstock Road 28.79 WOLVERCOTE 30.09 Oxford North Junction with DCL (64.45) 30.20 PORT MEADOW formerly SUMMERTOWN 30.52 Oxford New Junction with ONJ1 30.75 junction with DCL (63.66) 31.22 OXFORD REWLEY ROAD